Assessment 5-LA018092
Part A
Item
Particulars
Unit
Quantity
Rate
$ Cost
A
Waterproofing
Apply undertile sealant to walls and floors
m2
127.5
$10.54
$1344.00
B
Tiler
Ceramic tiles to bathroom floors laid in sand
cement bed set down on waterproofing
m2
26
$159
$4,134.00
C
Tiler
Ceramic tiles to bathroom walls laid in sand
cement bed set down on waterproofing
m2
102
$365.11
$9492.76
D
Installation – Vanity
LS
$2452.80
E
Installation – Plumbing
LS
$8764.00
(Calculations)
Powder Room
Floor 1,900 x 1,800 = 3.42m2
Walls (1,900 + 1,900 + 1,800 + 1,800) x 2,400 = 17.76m2
Laundry
Floor 2,090 x 2,560 = 5.35m2
Walls (2,090 + 2,090 + 2,560 + 2,560) x 2,400 = 22.32m2
Ensuite
Floor (1,500 x 3,400) + (900 x 1,520) = 6.47m2
Walls (2,400 + 900 + 1,520 + 900 + 1,880 + 1500 + 3,400) x 2,400 = 30m2
Bathroom
Floor 3,260 x 3,290 = 10.73m2
Walls (3,260 + 3,260 + 3,290 + 3,290) x 2,400 = 31.44m2
Total floor = 25.97m2
Total Wall = 101.52m2
/
Part A – Labour Constants for above trades
(see following pages)
Project Item A
Trade: Waterproofer
For: Waterproofing surfaces
Item
Description of work
Quantity
Rate
Matrerial
Labour Direct
contract Sub
Work
Plant
TOTALS
BASIS: per square meter
Material
Waterproof membrane 127.5m2
3m2 / L per coat (2 coats needed )
127.5 / 3 = 42.5 x 2 = 85
Allowance for waste 5% = 89.25
89.25/20 tub = 5 tubs needed
5
$100.00
$500.00
$500.00
Total Materials
$500.00
Labour
Waterproofer to seal floors and walls 6 hours
6
$50.00
$300.00
Labourer to assist above 6 hours
6
$50.00
$300.00
Total Labour
$600.00
Sundry tools and equipment for installation
$100.00
Total Labour and Materials
$1200.00
Builder’s Margin
$144.00
Total
$1344.00
Total waterproofing per m2
$10.54
10
Part B
Item
Particulars
Unit
Quantity
Rate
$ Cost
1
Name Board
LS
$25.00
2
Technical drawings and
documentation
LS
$5,000.00
3
Survey/Setting out
m2
720
$1.00
$720.00
4
Scaffolding and Access
m2
120
$80.00
$9,600.00
5
Temporary electricity service
LS
$500.00
6
Temporary water service
LS
$250.00
7
Temporary fencing 2,400mm W x
1,800mm H
m
8
$55.00
$440.00
8
Site accommodation
m2
720
$15.00
$10,800.00
9
Skip bin hire
m3
35
$80.00
$2,800.00
10
Supervision of the site
m2
720
$5.00
$3,600.00
11
Quality control
m2
720
$5.00
$3,600.00
12
Workplace health and safety
LS
$1,000.00
13
Insurance (Public liability &
Workers Comp)
LS
$3,000.00

QUALITY: 100% ORIGINAL – NO PLAGIARISM.