Assignment 1 2019Building Estimates and Tendering

Assignment 1 2019Building Estimates and Tendering
Australian Expert Writers
1
Assignment 1
+50%A report on the factors that
influence on the accuracy of early-stage construction cost estimate based on a designedreal-life construction project scenario.
Estimator ?????? 2
+55%
+40%
Key Instructions
0 Word limit: Total of 1000 words (+/-10%) excluding references and appendices.
0 ProjectScenario(250 words)
0 Preliminaryestimating method (250 words)
0 Analysisoffactors(500 words)

3
Key Instructions
0 Follow the givenFormatting Guide in the assignment 1 outline in vUWS.

4

0You are required to selectONEproject fromTable 1
Assignment 1

5
0 There are three tasks to be done in this assignment.
Assignment 1

Task 1 : Develop a brief project scenario from the project details given in Column 2 in Table 1

0 This means; you are required to describe further on the project design, materials used, services & facilities provided, functional area allocation, project duration, project cost etc..
E.g. Further development of scenario on design and materials (few elements) as follows:
Shape : Complex shaped tower with curved aluminum and glass exterior wall cladding.
Walls : Internal walls are finished with premium quality designer wall papers.
Floors : Common floor areas are finished with polished granite flooring and all internal floor areas of residential apartments are finished with premium quality designer carpets except for toilets.
0 Suggested word limit for this task is 250 words

6
Assignment 1

0 There are three tasks to be done in this assignment.Task 2 : Details of the preliminary estimating method adopted in
preparing the early stage construction cost estimate0 You are required to include ;
0 Preliminary estimating method usedE.g. Superficial floor area method (describe how this method was used for the chosen project to prepare the early
stage cost estimate and why this method was selected)
0 What were the information available to prepare the preliminary estimate ?E.g. sketch plans, functional area schedule etc.
0
0 0
At what stage of the project, the preliminary estimate was prepared ?
How did you find cost information (various sources)?What were the assumptions made when preparing the preliminary estimate ?
0 Suggested word limit for this task is 250 words
7
0 There are three tasks to be done in this assignment.
Task 3 : Detailed analysis of the chosen factors that influenced on the accuracy of early stage construction cost estimate and caused the final construction cost of the project to vary significantly from it.
Assignment 1

0 Youareexpectedtoselect2to3 factors from the predicted list of factors given in Column 3 in Table 1for the chosen project scenario.
0 Suggestedwordlimitforthistaskis500 words.

8
0 Therearethreetaskstobedoneinthis assignment.
Assignment 1

Task 3 continued…
E.g. of an influencing factor :
1. Plant, labour, material shortage and price escalations :
0 Analyze factors by providing supporting evidences E.g. for the above factor You could :
0 Compare martial, labor and plant market information (availability and price)at the time when the estimate was prepared and the actual construction happened
0 Provide information on drastic construction boom in Sydney / Sydney suburbs during 2016 – 2018
0 Include what % of cost (approximate) of the project was affected with this factor
0 Include some other facts to support your argument
(Your facts should support the argument “though you allowed adequately for price escalations in your estimate, drastic change in construction volume during the affected period impacted on the accuracy of your estimate)
0 Select factors

9
0 Therearethreetaskstobedoneinthis assignment.
Assignment 1

Task 3 continued…
E.g. of an influencing factor :
1. adverse weather conditions (droughts) made site operations difficult :
0 Analyze factors by providing supporting evidences E.g. for the above factor You could :
0 Compare the weather condition in Wagga Wagga (temperature, amount of rain) at the time when the estimate was prepared and the actual construction happened
0 Provide information on droughts condition in Wagga Wagga and regional NSW during 2016 – 2018
0 Include what site operations were affected by drought condition and how it affected
0 Include what % of cost (approximate) of the project was affected with this factor
0 Include some other facts to support your argument
(Your facts should support the argument “though you allowed adequately for adverse weather conditions in your estimate, unpredicted severe drought condition impacted on the accuracy of your estimate)
0 Select factors

10
Assignment 1
0 Suggested information sources :
0 lecturers and tutorials
0 Published information : Text books, price books, research papers, newspapers, websites etc.
0 Information from the industry sources :Example : Developers, Consultants, Contractors, Material suppliers etc.0 Information from relevant authorities and institutionsExample : Banks, councils etc.
The evidence of data collection from above sources should be provided in Appendices

11
Marking Criteria

12
For Referencing

All sources of information, including any interviews undertaken with building firms, which contributed to your assignment, must beacknowledged and referenced using WSU Harvard referencing.

0 To refer research articles and books using Harvard see0 http://library.westernsydney.edu.au/main/sites/default/files/cit
e_Harvard.pdf
0 https://library.westernsydney.edu.au/main/guides/referencing- citation
0 To refer interviews using Harvard also see this library video:UWS Library – Referencing a Personal Communication using UWS Harvard
0 https://www.youtube.com/watch?v=JDEnT42mtLkGood Luck with your assignment!
13

QUALITY: 100% ORIGINAL PAPERNO PLAGIARISM - CUSTOM PAPER

Recent Completed and delivered Papers

# Topic title Subject Area Academic Level Pages delivered
6
Writer's choice
Business
University
2
1 hour 32 min
7
Wise Approach to
Philosophy
College
2
2 hours 19 min
8
1980's and 1990
History
College
3
2 hours 20 min
9
pick the best topic
Finance
School
2
2 hours 27 min
10
finance for leisure
Finance
University
12
2 hours 36 min