65693 – Assessment DetailsQualification Code/Title Advance Diploma

SOLUTION AT Australian Expert Writers

Assessment DetailsQualification Code/Title Advance Diploma of Computer System TechnologyAssessment Type Assessment – 3 Time allowedDue Date Location SCCM Term / YearUnit of CompetencyNational Code/Title ICTNWK507- Operate and Troubleshoot Medium Enterprise RoutersStudent DetailsStudent Name Student IDStudent Declaration: I declare that the work submitted is my own, and has not been copied or plagiarised from any person or source. Signature: ____________________________Date: _____/_/_________Assessor DetailsAssessor’s NameRESULTS (Please Circle) ?SATISFACTORY?NOT SATISFACTORYFeedback to student:*If Student is Not SatisfactoryReassessment Required ? Yes ? NoAssessor Declaration: I declare that I have conducted a fair, valid, reliable and flexible assessment with this student, and I have provided appropriate feedback.Signature: ________________________Date: ______/_______/___________Comment:Instructions to the Candidates? This assessment is to be completed according to the instructions given below in this document.? Should you not answer the tasks correctly, you will be given feedback on the results and gaps in knowledge. You will be entitled to one (1) resubmit in showing your competence with this unit.? If you are not sure about any aspect of this assessment, please ask for clarification from your assessor.? Please refer to the College re-submission and re-sit policy for more information.? If you have questions and other concerns that may affect your performance in the Assessment, please inform the assessor immediately.? Please read the Tasks carefully then complete all Tasks.? To be deemed competent for this unit you must achieve a satisfactory result with tasks of this Assessment along with a satisfactory result for another Assessment.? This is an Open book assessment which you will do in your own time but complete in the time designated by your assessor. Remember, that it must be your own work and if you use other sources then you must reference these appropriately? Submitted document must follow the given criteria. Font must be Times New Roman, Font size need to be 12, line spacing has to be Single line and Footer of submitted document must include Student ID, Student Name and Page Number. Document must be printed double sided.? This is Individual Assessments. Once you have completed the assessment, please provide the Hard copy of the Assessments to your Trainer/ Assessor.? Plagiarism is copying someone else’s work and submitting it as your own. Any Plagiarism will result in a mark of Not Satisfactory. SCCM uses Safe Assign Plagiarism Checker to check the originality of the student assessment. Student must be aware of and understand the SCCM’s policy on plagiarism and certify that this assignment is their own work, except where indicated by referencing, and that student have followed the good academic practices noted above.Assessment InformationThe assessment tasks for ICTNWK507 Install, Operate and Troubleshoot Medium Enterprise Routers are included in this Student Assessment Tasks booklet and outlined in the assessment plan below.To be assessed as competent for this unit, you must complete all the assessment tasks satisfactorilyAssessment PlanAssessment Task Overview1. Written task Students must correctly answer all questions.2. Report writing You are required complete the report based on scenario given in Task.3. Practical/Project You are required complete the practical tasks based on scenario given in Task.Assessment PreparationPlease read through this assessment thoroughly before beginning any tasks. Ask your assessor for clarification if you have any questions at all.When you have read, and understood this unit’s assessment tasks, print out the Student Assessment Agreement. Fill it out, sign it, and hand it to your assessor, who will countersign it and then keep it on file. Keep a copy of all your work, as the work submitted to your assessor will not be returned to you.Assessment appealsIf you do not agree with an assessment decision, you can make an assessment appeal as per your RTO’s assessment appeals process.You have the right to appeal the outcome of assessment decisions if they feel they have been dealt with unfairly or have other appropriate grounds for an appeal.Naming electronic documentsIt is important that you name the documents that you create for this Assessment Task in a logical manner.Each should include:• Course identification code• Assessment Task number• Document title (if appropriate)• Student name• Date it was createdFor example, ICTNWK507 AT3 Support Small Scale Report Joan Smith 20/10/18Additional ResourcesYou will be provided with the following resources before you begin Assessment TaskAssessment InstructionsEach assessment task in this booklet consists of the following:Assessment Task Cover SheetThis must be filled out, signed and submitted together with your assessment responses.If you are submitting a hard copy, the Cover Sheet should be the first page of each task’s submission.If you are submitting electronically, print out the cover sheet, fill it out and sign it, then scan this and submit the file.The Assessment Task Cover Sheet will be returned to you with the outcome of the assessment, which will be satisfactory (S) or unsatisfactory (U). If your work has been assessed as being not satisfactory, your assessor will include written feedback in the Assessment Task Cover Sheet giving reasons why. Your assessor will also discuss this verbally with you and provide advice on re-assessment opportunities as peryour RTO’s re-assessment policy.Depending on the task, this may include• resubmitting incorrect answers to questions (such as short answer questions and case studies)• resubmitting part or all a project, depending on how the error impacts on the total outcome of the task• redoing a roleplay after being provided with appropriate feedback about your performance• being observed a second (or third time) undertaking any tasks/activities that were not satisfactorily completed the first time, after being provided with appropriate feedback.Assessment Task InformationThis gives you:• a summary of the assessment task• information on the resources to be used• submission requirements• re-submission opportunities if requiredAssessment Task InstructionsThese give questions to answer or tasks which are to be completed.Your answers need to be typed up using the software as indicated in the Assessment Task Instructions.Copy and paste each task’s instructions into a new document and use this as the basis for your assessment task submission. Include this document’s header and footer.If you are submitting electronically, give the document a file name that includes the unit identification number, the task number, your name and the date.ChecklistThis will be used by your assessor to mark your assessment. Read through this as part of your preparation before beginning the assessment task. It will give you a good idea of what your assessor will be looking for when marking your responses.Assessment 3 Project WorkThis information is to be handed to each student to outline the assessment requirementsTask summaryYou are required to analyses the scenario of SCCM. Based on the given information you are required to design the proposed IT infrastructure for SCCM.This assessment is to be completed in the simulated work environment in the RTO. There are two part on this assessment Part A, Band Part C, your are required to complete both of task accordingly to satisfy the assessment.TimingYour assessor will advise you of the due date of these submissions.SubmitStudent must demonstrate the performance in class to their trainerPacket Tracer FileProject Document will All Screen Shots of work / performanceProject Sign off Sheet Assessment criteriaFor your performance to be deemed satisfactory in this assessment task, you must satisfactorily address all of the assessment criteria. If part of this task is not satisfactorily completed, you will be asked to complete further assessment to demonstrate competence.Re-submission opportunitiesYou will be provided with feedback on their performance by the Assessor. The feedback will indicate if you have satisfactorily addressed the requirements of each part of this task.If any parts of the task are not satisfactorily completed, the assessor will explain why, and provide you written feedback along with guidance on what you must undertake to demonstrate satisfactory performance. Re-assessment attempt(s) will be arranged later and date.You have the right to appeal the outcome of assessment decisions if you feel that you have been dealt with unfairly or have other appropriate grounds for an appeal.You are encouraged to consult with the assessor prior to attempting this task if you do not understand any part of this task or if you have any learning issues or needs that may hinder you when attempting any part of the assessment.Please read carefully the case study and complete all of the given tasks with appropriate screen shot of all Evidence of the configuration.PART ACase study scenarioYou are working as a Network Engineer for Nubex Pty Ltd. Company is currently in the process of setting of five global DHCP servers as a part of their company expansion across the SydneyYour main job is to design the network architecture design for all 5 LANs and WAN connection to connect all LAN across the Sydney. You are also asked to design IP address scopes for five global DHCP servers as part of a project to deploy your organisation’s International email system. Since RIP will be the standard routing protocol, zero subnets will be used to conserve IP addresses. You have been told that Nubex Pty Ltd. is going to use private address 10.0.0.0After discussion with the company’s IT Manager, you have identified the number of nodes needed for each LAN which is tabulated below. Now you need to work out the IP address and subnet mask needed to configure each LAN. You also need to design IP address for serial link to connect various LANs.Location Number of NodesTownhall (TH) 350St James (SJ) 190Oranpark (OP) 55Burwood (BW) 400Parramatta (PM) 77Router links (For serial connection)TH-SJ 2SJ-OP 2OP-BW 2BW-PM 2PM-TH 2You must complete all the practical tasks using packet tracerTask 1What types of routers are needed and how many of them are required according to given specification? Similarly find out how many switches are needed for this complete project and what type of switches will be suitable for each LAN.Outcome ? Satisfactory? Not SatisfactoryCommentTask 2Establish the sitting and types of terminals, processors and required protocols and architecture based on technical specification and requirements.Outcome ? Satisfactory? Not SatisfactoryCommentTask 3Set up the layout of the complete network in simulated environment using Packet tracer, visualizer application softwareOutcome ? Satisfactory? Not SatisfactoryCommentTask 4Provide details of complete network LAN and WAN diagrams. You need to provide full details of logical and physical topology you going to use, how you going to connect 5 different LAN across Sydney, what transmission media would you will and so on.Outcome ? Satisfactory? Not SatisfactoryCommentTask 5Design and calculate IP address scopes for seven global DHCP servers as part of a project to deploy your organisation’s International email systemOutcome ? Satisfactory? Not SatisfactoryCommentTask 6Design and calculate IP address for serial and Ethernet interfaces for each routerOutcome ? Satisfactory? Not SatisfactoryCommentTask 7Backup all configuration files in secure place/ FTP Server.Outcome ? Satisfactory? Not SatisfactoryCommentTask 8Do you need any kind of approval before you access the Nubex network? Create a template of secure sign off to obtain approval for plans, including security and timing.Outcome ? Satisfactory? Not SatisfactoryCommentTask 9Do can you ensure that there is a minimum disruption when you make changes to the network? Also, show a template of an email which notifies the employees at Nubex that some part of the network may not function during the installation of new device in the network.You need to product LAN and WAN diagram using Packet Tracer and need to submit completed Packet tracer files as the part of the AssessmentOutcome ? Satisfactory? Not SatisfactoryCommentPART BRead Care FullyIn this task, you need to re-create the network on the packet tracer and configure the router using VLSM dynamic routes. Create your IP addressing scheme and complete the addressing table below. After completing the configuration, test connectivity between the devices on the network.Task 1: Preparing the NetworkA. Cable the network based on the diagram using Cisco routerB. Check and clear the configuration on each routerOutcome ? Satisfactory? Not SatisfactoryCommentTask 2: Router ConfigurationA. Perform the router configuration of Router 1, 2 & 3• Configure the hostname• Disable DNS lookup• Configure an EXEC mode password• Configure this message-of-the-day bannerR1(config)#banner motd&Enter TEXT message. End with the character ‘&’.********************************!!!AUTHORIZED ACCESS ONLY!!!********************************&R1(config)#• Configure a password for console connections• Configure a password for VTY connectionsB. Configure and activate serial and Ethernet Address• Configure interface on Router 1, 2 & 3• Verify IP addressing and interfaces• Configure Ethernet interfaces of PC1, PC2 and PC3• Test the PC configuration by pinging the default gateway from the PCC. Configure classless routing using routing information protocol (RIP) version 2 (V2)• Enable dynamic routing• Enter classless network addresses• Verify RIPv2 routing and network commandsD. DebuggingProvide an example of the situation when you should use a debug commands in routers.Provide two commands used for debugging router.List two ports that a router can use to display debug outputHow do you stop debugging?You need to design fill up table as below.Assessor Checklist and CommentOutcome ? Satisfactory? Not SatisfactoryCommentPART CRead the Following Information Care fullyStar Vehicle Workshop is trying to design a network for its various departments using subnets. You need to design and use an IP addressing scheme for the topology shown in the Diagram. The organization has one class C address that you must subnet to provide a logical addressing scheme for the network.Create the following logical diagram in the packet tracer (including cabling, interfaces). Configure each device with the appropriate basic configuration commands.Configure the router’s interface address according to your IP addressing scheme. After completion, use the appropriate commands to verify that the network is working properlyThe organization recommends to use Classful subnetting.DigramTask 1 : Assess the network requirements.You have been given the 192.168.2.0/26 address space to use in your network design.The network consists of the following segments:• The network connected to router R1 will require enough IP addresses to support 20 hosts.• The network connected to router R2 will require enough IP addresses to support 20 hosts.• The link between router R1 and router R2 will require IP addresses at each end of the link.(Note: Remember that the interfaces of network devices are also host IP addresses and are included in the above addressing scheme.)Outcome ? Satisfactory? Not SatisfactoryCommentTask 2: Consider the following questions when creating your network design. Fill in the blanks.The Subnet mask for this network in dotted decimal format? ____The subnet mask for the network in slash format? _______The number of usable hosts are there per subnet? ___Number of the subnets needed for the organization’s network? ________Outcome ? Satisfactory? Not SatisfactoryCommentTask 3: Assign subnetwork addresses to the Topology Diagram in Packet Tracer.1. Assign the first subnet (lowest subnet) to the network attached to R1.2. Assign the second subnet to the link between R1 and R2.3. Assign the third subnet to the network attached to R2.Outcome ? Satisfactory? Not SatisfactoryComment

Order from Australian Expert Writers
Best Australian Academic Writers

QUALITY: 100% ORIGINAL PAPERNO PLAGIARISM – CUSTOM PAPER

Assignment status: Already Solved By Our Experts

YOU MAY ALSO READ ...  English composition outline | English homework help

(USA, AUS, UK & CA Ph. D. Writers)

CLICK HERE TO GET A PROFESSIONAL WRITER TO WORK ON THIS PAPER AND OTHER SIMILAR PAPERS, GET A NON PLAGIARIZED PAPER FROM OUR EXPERTS

Order from Australian Expert Writers
Best Australian Academic Writers

QUALITY: 100% ORIGINAL PAPER – NO PLAGIARISM – CUSTOM PAPER